Location:
|
Central
Nevada
Treatment: Surfactant w/catalyst oxidizer |
Volume of soil:
|
1000 yd3 |
Contamination type(s):
|
JP-8 |
Average level of contamination:
|
15-
18,000 PPM |
Peak levels of contamination:
|
18,000 PPM |
Elapsed time for project:
|
5
Days |
Elapsed time after completion
prior to collecting confirmation samples:
|
21
Days |
Number of confirmation samples
collected:
|
20 |
Results from confirmation
testing:
|
< 1ppm Non-detect for JP-8. |